Brix Lelis - Profile and Journalist Details

Find journalists that align with your industry, location and vision. Unlock Brix Lelis's full journalist profile, including location, coverage topics, current employer, biography and preferences. Sign up today and start building journalist relationships that fuel your startup's growth.

Get connected with journalists today
Brix Lelis

Brix Lelis

Verified

Business Reporter, The Philippine Star

Taguig

Final Covers

profiles of business owners travel spiritsLifestyle

Doesn’t Cover

Anything outside entertainment, which doesn’t leave much really!

Journalist Type

-

Seniority Positions

-

Industries

Medium Formats

-

Content

Total articles 1716

  • AboitizPower starts work on battery storage project

    By Brix Lelis Verified| The Philippine Star Verified MANILA, Philippines — Aboitiz Power Corp., through Therma Marine Inc. (TMI), has broken ground on its 48-megawatt (MW) hybrid battery energy storage system (BESS) in Nasipit, Agusan del Norte. Targeted to come online in the second quarter of 2026, the Nasipit Hybrid BESS will be integrated into the company’s oil-fired power facility, TMI Mobile 2. The project’s financial details were not immediately made available.

    By Brix Lelis Verified · The Philippine Star

    Apr. 22, 2025

  • AboitizPower starts work on battery storage project

    By Brix Lelis Verified| The Philippine Star Verified MANILA, Philippines — Aboitiz Power Corp., through Therma Marine Inc. (TMI), has broken ground on its 48-megawatt (MW) hybrid battery energy storage system (BESS) in Nasipit, Agusan del Norte. Targeted to come online in the second quarter of 2026, the Nasipit Hybrid BESS will be integrated into the company’s oil-fired power facility, TMI Mobile 2. The project’s financial details were not immediately made available.

    By Brix Lelis Verified · The Philippine Star

    Apr. 22, 2025

  • DOE clears MGen’s 1,273-MW coal plants

    By Brix Lelis Verified| The Philippine Star Verified MANILA, Philippines — Pangilinan-led Meralco PowerGen Corp. (MGen) has secured confirmation from the Department of Energy (DOE) exempting its two coal-fired power plants from the existing coal moratorium. On the sidelines of a BusinessWorld forum yesterday, MGen president and CEO Emmanuel Rubio said the DOE has authorized the construction of the 1,200-megawatt Atimonan plant in Quezon and the 73-MW Toledo project in Cebu.

    By Brix Lelis Verified · The Philippine Star

    Apr. 22, 2025

As seen in

Company Info

The Philippine Star

Taguig, Philippines