Chris Edwards - Profile and Journalist Details

Find journalists that align with your industry, location and vision. Unlock Chris Edwards's full journalist profile, including location, coverage topics, current employer, biography and preferences. Sign up today and start building journalist relationships that fuel your startup's growth.

Get connected with journalists today
Chris Edwards

Chris Edwards

Verified

Editor, Inside Water Magazine

Melbourne

Doesn’t Cover

Beauty, fashion

Journalist Type

-

Seniority Positions

-

Industries

Medium Formats

-

Content

Total articles 1136

  • Selfs Point transformation takes shape

    By Chris Edwards Verified|Inside Water MagazineVerifiedMore than 5,800 concrete piles are being drilled into the ground at Selfs Point as TasWater lays the foundation for the future of wastewater treatment in Hobart with the Selfs Point Sewer Transformation project. Laid end-to-end, the piles would cover around 100 kilometres – roughly the distance from Brighton to Campbell Town.

    By Chris Edwards Verified · Inside Water Magazine

    Apr. 17, 2025

  • $100 million works program to build Coliban Water legacy

    By Chris Edwards Verified|Inside Water MagazineVerifiedColiban Water is embarking on a major 10-year program of works to renew and upgrade the critical pipes and pumps that move water and sewage around the region. This will add to an historic legacy of infrastructure projects that have supported local communities for more than 100 years. Coliban Water Managing Director Damian Wells said the first phase of the Water and Sewer Network Program, valued at an estimated $100 million, will be delivered over four years.

    By Chris Edwards Verified · Inside Water Magazine

    Apr. 16, 2025

  • Selfs Point transformation takes shape

    By Chris Edwards Verified|Inside Water MagazineVerifiedMore than 5,800 concrete piles are being drilled into the ground at Selfs Point as TasWater lays the foundation for the future of wastewater treatment in Hobart with the Selfs Point Sewer Transformation project. Laid end-to-end, the piles would cover around 100 kilometres – roughly the distance from Brighton to Campbell Town.

    By Chris Edwards Verified · Inside Water Magazine

    Apr. 17, 2025

As seen in

Company Info

Inside Water Magazine

Halifax, England, United Kingdom

+44 142 234 0220