Jamal James - Profile and Journalist Details

Find journalists that align with your industry, location and vision. Unlock Jamal James's full journalist profile, including location, coverage topics, current employer, biography and preferences. Sign up today and start building journalist relationships that fuel your startup's growth.

Get connected with journalists today
Jamal James

Jamal James

Verified

Multimedia Journalist, WBAY-TV (Green Bay, WI)

Final Covers

Witchcraft, Mysticism Transgender and Veterans Issues, PaganismUFO-UAP, Indie film making

Journalist Type

-

Seniority Positions

-

Medium Formats

-

Content

Total articles 115

  • More lane closures around Lambeau Field as phase two of construction begins

    By Jamal James Verified| WBAY-TV (Green Bay, WI) Verified TITLETOWN, Wis. (WBAY) - If you’re traveling through the Titletown area between now and the end of the NFL Draft, be prepared for additional road closures and construction. Phase two of the project began this morning, which included Lombardi Avenue heading eastbound and part of South Ridge Road closing. As we inch closer to the NFL Draft coming on April 24th, roads around the Titletown District are closing as construction continues to ramp up. “It’s interesting to see.

    By Jamal James Verified · WBAY-TV (Green Bay, WI)

    Apr. 13, 2025

  • Fox Valley organization helping businesses recognize human trafficking red flags ahead of NFL Draft

    By Jamal James Verified| WBAY-TV (Green Bay, WI) Verified OSHKOSH, Wis. (WBAY) - With the NFL Draft less than two weeks away, a Fox Valley organization is working with local businesses to bring awareness to the potential warning signs that serve as red flags for human trafficking. Much of that public awareness effort took place Saturday morning inside Damascus Road’s main office in Oshkosh. “You can’t comprehend, even in a small place like the Fox Cities, and Green Bay now, with exploitation of young women and children.

    By Jamal James Verified · WBAY-TV (Green Bay, WI)

    Apr. 13, 2025

  • More lane closures around Lambeau Field as phase two of construction begins

    By Jamal James Verified| WBAY-TV (Green Bay, WI) Verified TITLETOWN, Wis. (WBAY) - If you’re traveling through the Titletown area between now and the end of the NFL Draft, be prepared for additional road closures and construction. Phase two of the project began this morning, which included Lombardi Avenue heading eastbound and part of South Ridge Road closing. As we inch closer to the NFL Draft coming on April 24th, roads around the Titletown District are closing as construction continues to ramp up. “It’s interesting to see.

    By Jamal James Verified · WBAY-TV (Green Bay, WI)

    Apr. 13, 2025

As seen in

Company Info

WBAY-TV (Green Bay, WI)

Green Bay, Wisconsin, United States

+1 920-438-3227