Liam McLoughlin - Profile and Journalist Details

Find journalists that align with your industry, location and vision. Unlock Liam McLoughlin's full journalist profile, including location, coverage topics, current employer, biography and preferences. Sign up today and start building journalist relationships that fuel your startup's growth.

Get connected with journalists today
Liam McLoughlin

Liam McLoughlin

Verified

Assistant Editor, Route One Publishing Ltd, Aggregates Business Europe

Nottingham

Final Covers

personal finance christian living & catholic faithgoal setting & time management organization

Doesn’t Cover

Fake news and erotica

Journalist Type

Seniority Positions

Industries

-

Content

Total articles 1637

  • Volvo Energy launches BESS mobile power unit for heavy truck and EV charging

    By Liam McLoughlin Verified| EV Charging and Infrastructure Verified The PU500 offers an innovative solution for powering sites, whether in grid-connected mode or island mode. Designed to be adaptable, the PU500 is equipped with a battery capacity of 450-540 kWh, and it can be customized to meet the specific needs of each customer. Whether you need to power a remote construction site, a temporary event, or any other location that needs reliable energy, the PU500 is there to fill the gap.

    By Liam McLoughlin Verified · EV Charging and Infrastructure

    Apr. 16, 2025

  • Blink Charging teams with Eco-Movement to optimise EV charging experience

    By Liam McLoughlin Verified| EV Charging and Infrastructure Verified Eco-Movement collects, optimizes and enriches EV charging data on a global level and has established an extensive database with public and semi-public EV charging points and their real-time availability. This database is available to a wide range of leading industry players globally.

    By Liam McLoughlin Verified · EV Charging and Infrastructure

    Apr. 16, 2025

  • Volvo Energy launches BESS mobile power unit for heavy truck and EV charging

    By Liam McLoughlin Verified| EV Charging and Infrastructure Verified The PU500 offers an innovative solution for powering sites, whether in grid-connected mode or island mode. Designed to be adaptable, the PU500 is equipped with a battery capacity of 450-540 kWh, and it can be customized to meet the specific needs of each customer. Whether you need to power a remote construction site, a temporary event, or any other location that needs reliable energy, the PU500 is there to fill the gap.

    By Liam McLoughlin Verified · EV Charging and Infrastructure

    Apr. 16, 2025

As seen in

Company Info

Aggregates Business Europe